Estimating Task Duration in Project Management

Posted on November 18, 2022

If you want to make your project management robust, estimating the task duration is of utmost importance. In this article, we will discuss how to estimate task duration and will see some practical examples.

Content

  • What is task duration in project management?
  • How to Determine the Task Duration?
    • The Three-point technique (with historical data)
    • The Delphi method: Get the benefit from experienced people
  • Practical Examples of estimating the task duration
    • The Truss Lifting Task: The resource constraint method
    • Estimating the Duration of a Slab Formwork Removal
    • Considering Space Constraint While Estimating Duration of a Task
  • The Best Principle

What is task duration in project management?

In project management terms, task duration is the actual time it takes to complete.

Planned duration of a task = Planned finish date – Planned start date

Actual duration of a task = Actual finish date – Actual start date

As we are aware, Tasks are the smallest unit of a project. So finding an easy and correct way to estimate their duration is of utmost importance to ultimately find out the project duration.

How to Determine the Task Duration?

There are 3 fundamental steps in preparing the most basic project schedule. They are:

  1. Identifying the tasks involved in a project
  2. Setting the inter-task relationships
  3. Estimating the duration of each task and assigning the same to them

While preparing a project schedule it is a fundamental requirement to correctly estimate the duration of the tasks involved. While it is not difficult to assign the duration to the tasks in a scheduling software like MS Project or Primavera, estimating the duration of each task requires in-depth practical knowledge and proper calculation.

There are several techniques, some theoretical, and some practical by which we can estimate the task duration. In this article, we would focus much on practical methods. Of course, we would be touching on the theoretical methods as well to provide you with some ideas.

estimate task duration microsoft project

1. Three-Point Technique (with Historical Data)

What formula can a project manger use to estimate task duration? Let’s see in this part.

This is a very well-known technique of calculating the duration of a task that most schedulers are familiar with. This is a part of management courses all over the world. But the funny part is, in real life very few schedulers apply this. We believe that, unless you know the theory well you cannot utilize your practical knowledge to the fullest. Hence we will explain this technique with an example here.

The Three Point Technique to estimate the duration of a task utilizes historical data. Let us consider projects: A, B, C, and D, where tasks 1,2, and 3 were executed. We must have the tracked schedule of all four projects to perform this task.

As Step 1, We have obtained the data for the above projects from the tracked schedule. Now we will export the data in a spreadsheet to have more clarity on this.

historical data used to estimate the task duration in project management by three-point technique
Historical data of sample projects

Now, as the Step 2, we will find out the following three types of times for the completion of each of the tasks:

  1. Optimistic time (best case scenario, when everything goes the right way) – denoted by ‘O’
  2. Pessimistic time (worst case scenario, when everything goes the bad way) – denoted by ‘P’
  3. Most likely time (the usual scenario) – denoted by ‘M’

The formula to find out the task duration by the Three-point technique is:

Duration of task = (O + 4M + P)/6

This is also called the PERT Formula.

This is a simple formula a Project Manager can use to estimate task duration. Before we implement the formula, let’s first see how to find out the optimistic time, pessimistic time, and the most likely scenario from historical data.

From the above historical data, we observe that the above three points are as below for tasks 1, 2, and 3:

estimate task duration difficulty

To calculate the above, we have taken the least duration of the task as the optimistic time and the highest duration of the task as the pessimistic time. To calculate the ‘most likely’ time, we have made an average of the remaining two instances.

Now we will implement the above formula and estimate the duration of each task. The result is as per the table below:

Calculation of task duration in three-point technique

If you need the spreadsheet, we have made it available through the link given below:

Download the Task Duration CalculatorDownload

2. The Delphi Method: Consult the Subject Matter Experts and Get Benefit from their Experience

In case you don’t have the historical data to estimate the task duration of a project, there is an alternative!

Each construction company has its own bunch of experts in the field. So, you can simply circulate a spreadsheet with the task names on it to all such colleagues and get the most out of their experience. Let them opine on the possible duration of the tasks (with logic, of course) and you have a ready set of historical data at your disposal.

The steps of the Delphi Method is explained below for your better understanding:

Round-1: In order to acquire a wide knowledge of the experts’ perspectives on future events, ask generic questions. The questions might be distributed in the form of a questionnaire or survey. Collect and summarise the replies, deleting any extraneous information and looking for common points of view.

Round-2: The next round of questions should go deeper into the topic to clarify particular concerns based on the responses to the initial questions. These questions might potentially be sent as a questionnaire or survey. Collect and summarise the results once more, deleting any extraneous material and looking for common ground. Remember, we’re trying to reach an agreement.

Round-3: The final questionnaire is intended to aid in decision making. Concentrate on the areas of agreement. What is it that all the experts agree on?

You may prefer to have more than three rounds of inquiry to achieve a more certain conclusion. Once you get the data prepared, you can easily apply the three-point technique and prepare the first-cut schedule. Then keep a discussion session with the same with your most prominent colleagues in the field, and see wonders happen.

The only job left to you now is to screen the same keeping the contract duration intact. Adjust the available float that way.

Read More: What is Resource leveling in Project Management?

Practical Examples of Estimating Task Duration

Enough of theory, and let’s now discuss some real-life methods to estimate the task duration. We will use a few practical examples to do it, for the sake of easy understanding.

1. The Truss Lifting Task: Resource constraint method

I have a project where we need to lift structural steel pieces for the roof truss. We have enough space in the project to install only 3 tower cranes. It is not possible to lift the heavy steel members by any other means. In this case, the duration of the task is:

Duration of the task = Total number of lifts required / ( working hour per day / cycle time of 1 lift x no. of tower cranes in the project)

Estimating the truss lifting duration of a project with Restricted Resource Technique
Estimating the truss lifting duration of a project with Restricted Resource Technique

One point to note is, you need to add a little extra time to add a buffer. If you have time, refer to the historical data for the lift cycle time of a crane of similar capacity. Then apply the three-point technique to obtain what to consider in the above table.

2. Estimating the Duration of a Slab Formwork Removal Task

There is a specific technical rule for the formwork removal of Columns, Walls, Beams, and Slabs. The scheduler must follow the rule while estimating the duration of the task. For example, if the span of your slab is more than 4.5 m, you cannot remove the prop from the soffit of the slab before 14 days. Hence, you cannot start the block or brick masonry work within that period and it will govern the period of the task in this case.

Similarly, technically you need to cure the blockwork or brickwork for minimum 7 days, so you should plan for the plaster works keeping this in mind.

3. Considering Space Constraint While Estimating Duration of a Task

While estimating the task duration, pay attention to the limitation of maximum resource engagement. For example, you cannot engage much workers in a confined place. So, even if there is no resource constraints in your project, you cannot engage above a limit due to limitation of space.

The Best Principle

The estimation of the duration of a task can be done most appropriately only when there is a proper mix of statistical data and practical experience. Projects are unique in nature, so relying solely on the theoretical data is not a good choice. Also, when you are preparing the schedule for a time-bound project, keep in mind that you must maintain the contractual duration. You need to mobillize and optimize your resources that way.

Do you have any further points that we can consider to estimate the task durations of a project? Please share your idea in the comment box.

35 thoughts on “Estimating Task Duration in Project Management”

  1. Haircuts says:
    February 28, 2023 at 10:13 pm

    Thank you for writing this article. I appreciate the subject too.

    Reply
  2. Haircuts says:
    March 1, 2023 at 6:12 pm

    Great beat ! I would like to apprentice while you amend your web site, how could i subscribe for a blog site? The account helped me a acceptable deal. I had been a little bit acquainted of this your broadcast provided bright clear concept

    Reply
  3. Hi Hairstyles says:
    March 3, 2023 at 6:31 am

    Your articles are extremely helpful to me. Please provide more information!

    Reply
  4. Hairstyles says:
    March 9, 2023 at 7:58 am

    Thank you for your articles. They are very helpful to me. May I ask you a question?

    Reply
  5. Beauty Fashion says:
    March 11, 2023 at 11:21 pm

    Thank you for your articles. They are very helpful to me. May I ask you a question?

    Reply
  6. Beauty Tips says:
    March 11, 2023 at 11:28 pm

    Can you write more about it? Your articles are always helpful to me. Thank you!

    Reply
  7. Hairstyles says:
    March 13, 2023 at 7:32 am

    Thank you for your articles. They are very helpful to me. May I ask you a question?

    Reply
  8. Beauty Fashion says:
    March 14, 2023 at 1:05 am

    Thank you for your articles. They are very helpful to me. Can you help me with something?

    Reply
  9. Beauty Tips says:
    March 14, 2023 at 1:32 am

    Your articles are very helpful to me. May I request more information?

    Reply
  10. Fashion Styles says:
    March 17, 2023 at 12:15 am

    Sustain the excellent work and producing in the group!

    Reply
  11. Fashion Styles says:
    March 28, 2023 at 2:28 am

    Does your blog have a contact page? I’m having a tough time locating it but, I’d like to send you an e-mail. I’ve got some creative ideas for your blog you might be interested in hearing. Either way, great blog and I look forward to seeing it expand over time.

    Reply
  12. Fashion Styles says:
    March 30, 2023 at 2:42 am

    Right now it looks like BlogEngine is the top blogging platform out there right now. (from what I’ve read) Is that what you’re using on your blog?

    Reply
  13. Beauty Fashion says:
    March 30, 2023 at 4:10 am

    Thanks for every other magnificent post. The place else may just anybody get that kind of information in such a perfect manner of writing? I’ve a presentation next week, and I’m at the search for such info.

    Reply
  14. Latest Hairstyles says:
    April 29, 2023 at 12:20 pm

    Thank you for the good writeup. It in reality used to be a amusement account it. Look complex to more added agreeable from you! However, how can we be in contact?

    Reply
  15. Hairstyles says:
    May 6, 2023 at 11:06 pm

    Thanks for the sensible critique. Me & my neighbor were just preparing to do a little research on this. We got a grab a book from our area library but I think I learned more from this post. I am very glad to see such wonderful info being shared freely out there.

    Reply
  16. Latest Hairstyles says:
    May 13, 2023 at 12:00 am

    May I have information on the topic of your article?

    Reply
  17. online bca course says:
    May 15, 2023 at 7:42 am

    Thanks for the good writeup. It in fact used to be a entertainment account it. Glance complicated to more brought agreeable from you! By the way, how could we keep up a correspondence?

    Reply
  18. Haircuts says:
    May 18, 2023 at 7:56 pm

    Please provide me with more details on the topic

    Reply
  19. I Fashion Styles says:
    May 31, 2023 at 3:46 am

    fantastic points altogether, you simply gained a new reader. What could you suggest in regards to your post that you just made a few days in the past? Any certain?

    Reply
  20. Fashion Styles says:
    June 7, 2023 at 9:37 pm

    Great post. I was checking continuously this weblog and I’m impressed! Very helpful information particularly the closing part 🙂 I deal with such info a lot. I used to be seeking this particular information for a long time. Thanks and good luck.

    Reply
  21. graliontorile says:
    June 8, 2023 at 3:42 am

    I have been examinating out some of your stories and i can claim pretty clever stuff. I will definitely bookmark your website.

    Reply
  22. vorbelutr ioperbir says:
    July 20, 2023 at 10:11 am

    I always was concerned in this subject and stock still am, appreciate it for putting up.

    Reply
  23. Highlights Hairstyles says:
    August 1, 2023 at 1:00 am

    Nice weblog right here! Additionally your site lots up fast! What web host are you using? Can I am getting your associate link for your host? I want my website loaded up as quickly as yours lol

    Reply
  24. 24hr fitness says:
    August 1, 2023 at 8:05 pm

    I’m not sure why but this blog is loading very slow for me. Is anyone else having this issue or is it a issue on my end? I’ll check back later and see if the problem still exists.

    Reply
  25. Mohamed says:
    February 22, 2024 at 5:13 am

    Usually I do not read post on blogs, but I would like
    to say that this write-up very compelled me to try and do it!
    Your writing taste has been amazed me. Thanks, quite great
    post.

    Reply
  26. https://fun-wiki.win/index.php?title=Sage_Oil_a_hundred_and_one:_Qualified_Guidelines_for_Harnessing_its_Aromatic_and_Therapeutic_Gains_60403 says:
    February 22, 2024 at 7:50 am

    It’s remarkable in favor of me to have a website, which is helpful in favor of my experience.
    thanks admin

    Reply
  27. Myra says:
    February 22, 2024 at 8:13 am

    Hi there to all, the contents existing at this web page are genuinely remarkable for people experience,
    well, keep up the nice work fellows.

    Reply
  28. Marilynn says:
    February 22, 2024 at 8:22 am

    Pretty great post. I simply stumbled upon your weblog and wanted
    to mention that I’ve truly enjoyed browsing your weblog posts.
    In any case I will be subscribing on your rss feed
    and I’m hoping you write again soon!

    Reply
  29. www.indiegogo.com says:
    February 22, 2024 at 8:37 am

    These are actually impressive ideas in on the topic
    of blogging. You have touched some fastidious factors here.
    Any way keep up wrinting.

    Reply
  30. implementationmatters.org says:
    February 22, 2024 at 9:03 am

    Wow! At last I got a webpage from where I know how to really obtain valuable facts
    regarding my study and knowledge.

    Reply
  31. Pete says:
    February 22, 2024 at 9:31 am

    If you want to grow your familiarity only keep visiting this web page
    and be updated with the most up-to-date news update posted
    here.

    Reply
  32. Titus says:
    February 22, 2024 at 9:48 am

    Fantastic beat ! I would like to apprentice while you amend your
    website, how can i subscribe for a weblog web site? The account helped me a applicable deal.
    I have been tiny bit acquainted of this your broadcast provided shiny transparent
    concept

    Reply
  33. mawarslot says:
    September 25, 2024 at 12:26 am

    data hk data hk data hk data hk data hk
    Hi there friends, its great article on the topic of tutoringand
    fully defined, keep it up all the time.

    Reply
  34. www.dkair.kr says:
    September 26, 2024 at 12:42 am

    I would like to thank you for the efforts you
    have put in penning this site. I am hoping to see the same high-grade blog posts from you in the future
    as well. In fact, your creative writing abilities has encouraged me to get
    my own site now 😉

    Reply
  35. live draw sdy says:
    October 2, 2024 at 10:15 am

    slot88 slot88 slot88
    Appreciate this post. Will try it out.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Contract Management (8)
  • Home Construction (4)
  • Microsoft Project (4)
  • Project Cost Analysis (1)
  • Project Management (3)
  • Real Estate (2)
  • Technology (2)
©2025 ProjectOMetric | Design: Newspaperly WordPress Theme